Turn-key project. Structural and finishing works, mechanical works, electrical works, engineering systems, outdoor lighting and landscaping
The building consists of 2 housing block (1. , 14 stories + 2 technical stories and 2. , 9 stories + 2 technical stories). 2 office blocks (1. , 12 stories + 2 technical stories and 2. , 9 stories + 2 technical stories).
The outdoor facilities include the landscaping and outdoor lighting of this prof underground car parking and 2 stories of of shopping mall exist at the ground level.
Total number of flats are 100 among which, 47 are 3 room, 25 are 4 room, 21 are 5 room, 8 are 6 room and and 1 is seven room flat.
The shopping mall level consistes; restaurant for 225 people, 500 m² of sport center, 250 m² of conference hall, 300 m² of market, 555 m² of children center. Also various offices and stores exist on the shopping mall level.
The outdoor facilities include the landscaping and outdoor lighting of this prestigious complex at the center of Moscow.
Total area of office units are 16.600 m², whereas area of housing units are 24.000 m², shoppiing mall area is 17.500 m² and underground car parking area is 30.000 m²'dir.
Technical Systems