EMTEMT
International / Zavidovo Leisure Complex - Holiday Village
Date of contract
:
14/06/1995
Date of completion
:
22/09/1997
Employer
:
GlavUpDK (Main Administration for Service to the Diplomatic Corps)
Workplace
:
Moscow, Russian Federation
Construction area
:
10.000 м2
Details
:

The construction of the below-listed buildings situated at a total area of 53.3 hectares.

3 type of villas

Hotel with 40 rooms
Two-storey building with 40 bedrooms each including 2 beds. Total construction area is 5.100 m². The net area of the hotel rooms is 1306 m². The facilities are a health center, an indoor swimming pool, a conference hall, a mini market and a restaurant with baquet hall.

Indoor sport center
Single storey building with a mezzanine level. Total construction area is 1.724 m². The facilities are a tennis court, 2 squash courts, an aerobic hall, a fitness center, 2 massage rooms, a table tennis room, a vitamin bar, a fire place corner, 2 billiards and a sports shop.

Riding club and stables
Single-storey building with a mezzanine level. Total construction area is 560 m². The building includes stables for 8 horses.

Restoration of the existing restaurant building
Two-storey building with 1050 m² usable area. The restaurant section is for 60 people. It includes a bar for 28 people. The building has also an 8 rooms hotel.

2 artifical lakes
Improvement of two fish-lakes, their feeding and discharge canals off Volga river. Landscaping.

Outdoor sport center
3 tennis courts, 1 volleyball, 1 basketball fields. (In winter time, to be used as iceskating ring.)

Gas Station
4 pumps, fuel tanks, mini-market and the management building.

Management building
Kitch en, laundry, dry cleaning spaces, material supply and the erection of the related equipment, finishing works.

2 saunas
The project also includes the internal roads, general landscaping, within 53.3 hectares as well as the engineering systems.

Internal roads
Total lengthis 5.000 m.

Heat supply and hot water lines
Heating system is established through prefabricated concrete galleries. Total length is 3.600 m.

Water supply system
Ø160, Ø110 PE100 pipes. Total lenght is 5.000 m. 25 pieces of fire hydrants.

Sewerage
Ø300, Ø200 PVC pipes. Total lenght is 4.000 m.

Energy distribution lines
Underground cables. Total lenght is 60.000 m.

Outdoor lighting
Road boundary lighting with 3 m. high poles. Grass lighting with 0.90 m. high poles.

Weak Current Cables
Fire and security signalization, telephone and TV distribution lines within PVC covering.

All projects in International / Completed projects category
EMT Erimtan Müşavirlik Taahhüt Ticaret A.Ş.
Cinnah Caddesi No: 102/3-7. Çankaya, Ankara, 06550, T: +90 (312) 441 29 52, F: +90 (312) 441 29 55, emt@emt-erimtan.com
© 2010 EMT Erimtan Müşavirlik Taahhüt Ticaret A.Ş.
Web Tasarım